For a group running five to fifty sites, a payments change is an operational project rather than a procurement decision. The upside is real — better rates at volume, consolidated reporting, one relationship instead of nine — but the downside is that a bad rollout takes every venue offline on the same Saturday. Getting the sequence right is worth more than getting the last basis point off the rate.
Settle the reporting structure before anything ships
The main reason groups consolidate is visibility: what each site made, by revenue centre, comparable week on week. That structure — sites, regions, departments, revenue centres — needs to be agreed and configured before terminals are deployed, because retrofitting it across live sites is painful and usually gets half done.
Agree who owns which report, how often it is produced, and what decision it informs. A reporting hierarchy nobody uses is just configuration.
Pilot one representative site for two full weeks
Choose a mid-volume site with typical connectivity, not the flagship and not the quiet one. Run it for two complete trading weeks so you capture two weekends, a delivery cycle, a stocktake and at least one thing going wrong.
Collect the issues formally — from the site manager and the bar or floor staff, not just the head office view. The problems that derail rollouts are almost always operational details: where the terminal sits, how it charges, who reprints a receipt, what happens at cash-up.
Roll out in waves, with parallel running
After the pilot, deploy in waves of three to five sites, ideally early in the week. Keep the outgoing terminals live and physically on site for the first week of each wave. It costs almost nothing and eliminates the worst-case scenario during a Saturday service.
Do not schedule a wave into a site's peak week. Nobody should be learning a new terminal during a Christmas party season or a bank holiday weekend.
Train the people who will actually use it
Training a general manager is not training a site. The people who need fifteen minutes of hands-on time are the bar staff, servers, receptionists and duty managers who will be alone with the terminal at nine on a Friday.
Leave one printed page per site: how to take a payment, how to refund, how to reprint, how to cash up, and who to phone. That single page prevents most out-of-hours support calls.
Check the contractual detail across every site
Groups accumulate legacy contracts. Before committing, check each site's existing terminal leases and processing agreements for notice periods and end dates — leases signed separately from the processing agreement are the usual trap and can run for years after the processing has moved.
Build the rollout schedule around those dates so you are not paying twice for longer than necessary.
One named contact, reachable during service
The clearest difference between a smooth rollout and a bad one is having a named account lead who answers the phone at eight on a Saturday evening, rather than a portal that opens a ticket for Monday.
That is how we run every group rollout: one point of contact through pilot, waves and the first trading quarter, with direct access to Teya rather than a call centre queue. For groups, that responsiveness is usually worth more over a year than a marginal rate difference.
Common questions
How long does a multi-site payments rollout take?
Allow two weeks for a pilot, then waves of three to five sites at roughly weekly intervals. A twelve-site group is typically complete within six to eight weeks without disrupting trade.
What is the biggest risk in a group rollout?
Switching too many sites at once with no fallback. Parallel-running the outgoing terminals for a week per wave removes almost all of the operational risk.
Key takeaways
- Agree the reporting hierarchy before any hardware is deployed.
- Pilot one representative site for two full trading weeks, including two weekends.
- Roll out in waves of three to five sites, never into a site's peak week.
- Parallel-run the old terminals for the first week of each wave.
- Train floor staff, not just managers, and leave a one-page reference on site.
- Audit existing terminal leases for notice periods before scheduling the rollout.